  Projects

Projects


Bruce A Units 1 & 2 Steam Generator Replacement (EPC),

Tiverton, Ontario

Description:
SNC-Lavalin Nuclear has been awarded an Engineering, Procurement and Construction contract to replace the Steam Generators at Units 1 and 2 of Bruce Power's Bruce A Nuclear Power Station. Project commenced in 2005.

more about this project...



Gentilly-2 Refurbishment (EPCM),

Bécancour, Quebec
Description:
SNC-Lavalin Nuclear has been awarded a contract to manage the Pre-Project Planning and Estimating phase and negotiate the fuel channel contract with AECL as part of an integrated EPCM team with Hydro-Quebéc for the potential execution of the $1B Refurbishment in 2010.

more about this project...


Bruce Power Refurbishment Bruce A Unit 1 & 2 ( Feasibility Study),

Bruce County, Ontario
Description:
In 2004, SNC-Lavalin Nuclear (SLN) formed an Alliance with AECL, Babcock & Wilcox, NSS and other groups to estimate and submit a proposal to Bruce Power for the refurbishment of Units 1 & 2. The study consisted of preparing the scope of work, the estimates, the overall project schedule, and a risk analysis. SLN was a key player in this process and had staff working at the plant. Subsequent to this exercise, SLN later bid and won two major contracts from Bruce Power.

more about this project...


Pebble Bed Modular Demonstration Reactor (EPCM),

South Africa
Description:
SNC-Lavalin Nuclear is acting as the EPCM subcontractor for PBMR Demonstration Power Plant. The current schedule is to start construction in 2007 and for the demonstration plant to be completed by 2010. The first commercial PBMR modules are planned for 2013.

more about this project...


Bruce A Units 1 & 2 Restart – BOP Work (EPC),

Tiverton, ON

Description:
SNC-Lavalin Nuclear along with its Joint Venture partner AECON, were awarded the EPC responsibility of undertaking at Bruce A Units 1 and 2, six aspects of the refurbishment process:
• Mechanical Pumphouse Turbine
• Mechanical Reactor Building
• Copper Removal
• Instrumentation and Control Systems
• Analysis
• ASB


more about this project...



Qinshan 1 & 2,

China

Description:
2 x 700 MWe CANDU reactors built with CANATOM NPM responsible for the civil and structural design of the site and buildings and nuclear and non-nuclear systems outside the containment structure (BNSP) and construction management and the supply of equipment and project management for the NSSS and the BNSP portions of the plants.


more about this project...



Bruce Used Fuel Dry Storage (BUFDS),

Tiverton, Ontario

Description:
Design, construction, fabrication, procurement, installation and commissioning of the structures and equipment required to transfer used fuel from in-pool storage to dry storage in canisters as part of a joint venture with Aecon.


more about this project...



Wolsong Nuclear Generating Station, Units 2, 3 & 4,

South Korea

Description:
4 x 700 MWe CANDU reactors have been built in South Korea. Units 2,3 and 4 were completed in 1999. CANATOM NPM was responsible for the civil and structural design of the site and buildings, the nuclear and non-nuclear systems outside the containment structure (BNSP) and the turbine building and systems (BOP). CANATOM NPM was also responsible for the construction management and the supply of equipment for the plant.


more about this project...



Sudbury Neutrino Observatory,

Sudbury, Ontario

Description:
Design, Project and Construction Management of an international nuclear physics laboratory located 2 km underground at an INCO operating nickel mine.


more about this project...


 

 

Bruce A Units 1 & 2 Steam Generator Replacement (EPC)
Tiverton, Ontario, Canada

Engineering, procurement and construction contract to replace the Steam Generators


 

 



Homepage     Top of page