  Bruce A Units 1 & 2 Restart – BOP Work (EPC)

Project:
Bruce A Units 1 & 2 Restart – BOP Work (EPC)

Location:
Tiverton, Ontario

Client:
Bruce Power

SNC-Lavalin Nuclear’s Role:
SNC-Lavalin Nuclear along with its joint venture partner AECON, were awarded the EPC contract for Bruce A Units 1 and 2, and six aspects of the refurbishment process:

• Mechanical Pumphouse Turbine

• Mechanical Reactor Building

• Copper Removal

• Instrumentation and Control Systems

• Analysis

• ASB

Play Video




 
 

Bruce A Units 1 & 2 Steam Generator Replacement (EPC)
Tiverton, Ontario, Canada

Engineering, procurement and construction contract to replace the Steam Generators


 

 